Ready for Sanding Finish Drywalling Project

Much of the ceiling and bulkheads is ready for finish sanding. Skim coating will dry fast and be ready to sand tomorrow. A few corner beads left to skim.

Drywall Taping Phase About 4

Here what the site looks like after 4 rounds at it.

The four corner butt joint / vent obstruction came out good!

The entrance way will look good after I hit the corner beads on the 45 's again.

This double patch up / bulkhead assembly to existing wall is taking shape.

After skim coating horizontal joint.